Project, Contract

Training Course: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (58)

PC4071

19 - 23 Apr 2027

Madrid (Spain)

Cost : 5775 € Euro

Introduction

Managing technical projects effectively in today’s competitive environment requires accurate control over schedule, cost, and performance. Earned Value Management (EVM) provides an integrated approach to measure project performance against scope, cost, and schedule baselines. By comparing actual accomplishments with planned work and budget, EVM enables early identification of schedule slippage and cost overruns, allowing timely corrective actions. This course equips participants with practical knowledge to implement EVM effectively for improved project control and decision-making.

 

Course Objectives

Participants will learn to:

  • Understand and implement an effective performance management system using EVM
  • Apply EVM techniques to monitor project scope, cost, and schedule
  • Develop control account plans (CAPs) and establish a project baseline
  • Identify and mitigate project risks early
  • Make timely decisions regarding scope, cost, and schedule parameters
  • Interpret and report EVM metrics to support management decision-making

 

Target Audience

This course is designed for:

  • Project Managers and Project Engineers
  • Program and Portfolio Managers
  • Contract and Procurement Managers
  • PMO Staff and Project Controllers
  • Professionals responsible for project performance measurement and reporting

 

Course Outline

Day 1– Introduction to EVM

  • Management vs. Engineering Criteria
  • Evolution of EVM Concepts
  • Cost/Schedule Control System Criteria (C/SCSC)
  • Performance Measurement as an EVM Technique
  • EVM in Project Management

Day 2– Project Scope & Work Breakdown

  • Understanding Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Decisions
  • Linking WBS to Earned Value

Day 3– Planning, Scheduling, and Budgeting

  • Defining Project Objectives
  • Planning and Scheduling the Project
  • Scheduling and Earned Value Integration
  • Estimating and Budgeting Resources for Control Account Plans (CAPs)
  • Management Reserves and Contingency Planning

Day 4– Performance Measurement & Monitoring

  • Establishing the Earned Value Project Baseline
  • Control Account Plans (CAPs)
  • Performance Measurement Baseline (PMB)
  • Maintaining Baseline and Managing Scope Changes
  • CAPs Performance Measurement and Variance Analysis
  • Materials and Subcontractor Integration in EVM

Day 5– Forecasting & Reporting

  • Final Cost and Schedule Forecasting
  • Estimate at Completion (EAC)
  • Over Target Baseline (OTB) Process
  • Predicting Project Duration
  • EVM Reporting Formats
  • Preparing and Interpreting Integrated Cost/Schedule Reports

Project, Contract

Training Course: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (58)

PC4071

19 - 23 Apr 2027

Madrid (Spain) -

Cost: 5775 € Euro


  About Madrid

Madrid is a city that combines its enduring history with its cosmopolitan atmosphere to create a destination that favored amongst tourists from around the world. This is a city that is very much bursting at the seams with life and its vibrant atmosphere, cultural attractions and connection with history ensure travelers have everything they could possibly want from a European city break. At the end of a flight to Madrid, there are sites to see, picturesque streets to roam and, of course, excellent shopping opportunities to explore. Visitors can immerse themselves in Madrid's fantastic local culture, its peerless art scene and world acclaimed fine dining. In fact, there is very little that Madrid doesn't have to offer.


  Things to do and places to visit in Madrid

The only problem travelers will encounter during their visit to Madrid is knowing what to do first. Sampling the mouth-watering tapas, strolling through one of the many excellent museums or even simply soaking up the atmosphere are all excellent options. Spend a sunny day wandering through the splendid squares or marvel at the intricate architecture of the churches.With so many options, flights to Madrid are great for people of any age or inclination.

When visiting Madrid, be sure to:

  • See the superb collection of art is the Museo del Prado.
  • Stroll down the Gran Via.
  • Enjoy the atmosphere of the Plaza Mayor.
  • Wander through the stunning gardens of the Parque del Buen Retiro.
  • See the beautiful mansion of the Museo Lazaro Galdiano.
  • Find quirky fashions in the Fuencarral market.
  • Try some of the many different tapas dishes.
  • Visit the statues of Don Quixote and Sancho Panza in the Plaza de Espana.
  • See the breathtaking Basilica de San Francisco El Grande.
  • Wander the Casa de Campo park, which is five times the size of Central Park.
  • Shop in the luxury boutiques of the Golden Mile.
  • Look for bargains at the El Rasto flea market.
  • See Picasso's Guernica in the Reina Sofia museum.
  • Snack on churros with chocolate.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019