Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (56)

CO8113

15 - 19 Mar 2027

London (UK)

Cost : 6300 € Euro

Introduction

Effective project management is essential in today’s competitive environment to ensure projects are completed on time, within budget, and according to technical requirements. This course focuses on Earned Value Management (EVM) as a powerful tool for measuring project performance, controlling costs and schedules, forecasting project outcomes, and supporting better decision-making throughout the project lifecycle.

Objectives

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

Target Audience

  • Project Managers and Project Engineers
  • Planning and Scheduling Engineers
  • Cost Control and Project Control Professionals
  • PMO and Program Management Professionals
  • Contracts and Technical Managers
  • Construction, Engineering, and Infrastructure Professionals
  • Operations and Maintenance Project Teams
  • Professionals involved in budgeting, forecasting, and performance measurement
  • Team Leaders responsible for project execution and reporting
  • Anyone seeking to improve project monitoring, cost control, scheduling, and Earned Value Management (EVM) skills

Outlines 

Day 1: Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Day 2: Scope of the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Day 3: Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

 Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline: Managing Changes in Scope

Day 4: Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Day 5: Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (56)

CO8113

15 - 19 Mar 2027

London (UK) -

Cost: 6300 € Euro


  About London

The UK capital of London is a city that combines the old and the new. It is as equally famous for the latest fashion and innovation as it is for its impressive heritage. London's attractions range from the Royal Palace to the DIY atmosphere of its markets. It is also a picturesque city of parks and of course, the majestic Thames River. The city extends for miles beyond its ancient core and each neighborhood has its own charming atmosphere for visitors to explore. London also wears its status as a world city proudly and the influence of different cultures is plain to see in the food and fashion of the capital.


  Things to do and places to visit in London

With so many attractions in London, anyone can find something to delight them. Art lovers will enjoy the world-renowned museums and galleries, most of which are free. Sports fans are spoilt for choice by the city's array of football clubs. Theatre and music fans have a vast list of venues to visit, whilst shopaholics have Harrods, Oxford Street, Camden and much more to look forward to after arranging flights to London.

Some unmissable London attractions include:

  • Seeing priceless masterpieces in the Tate Britain or the National Gallery.
  • Watching the changing of the guard at Buckingham Palace.
  • Visiting Trafalgar Square's famous monument.
  • Marveling at the Crown Jewels in the Tower of London.
  • Getting a bird's eye view of the city from the London Eye.
  • Tasting one of Brick Lane's famous curries.
  • Browsing the exclusive shops of Knightsbridge.
  • Visiting a market – Spitalfields for antiques, Camden for clothes or Borough Market for street food.
  • Admiring design from around the world in the Victoria and Albert Museum.
  • Looking for clues at the home of fiction's most famous detective, Sherlock Holmes.
  • Strolling through one of the lovely parks, including Hyde Park, St James' Park or Kew Gardens.
  • Eating Britain's most famous dish, fish and chips.
  • Watching the street performers in Covent Garden.
  • Enjoying the views at a South Bank cafe.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019