Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (56)

CO8113

10 - 14 Jan 2027

Cairo (Egypt)

Cost : 4100 € Euro

Introduction

Effective project management is essential in today’s competitive environment to ensure projects are completed on time, within budget, and according to technical requirements. This course focuses on Earned Value Management (EVM) as a powerful tool for measuring project performance, controlling costs and schedules, forecasting project outcomes, and supporting better decision-making throughout the project lifecycle.

Objectives

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

Target Audience

  • Project Managers and Project Engineers
  • Planning and Scheduling Engineers
  • Cost Control and Project Control Professionals
  • PMO and Program Management Professionals
  • Contracts and Technical Managers
  • Construction, Engineering, and Infrastructure Professionals
  • Operations and Maintenance Project Teams
  • Professionals involved in budgeting, forecasting, and performance measurement
  • Team Leaders responsible for project execution and reporting
  • Anyone seeking to improve project monitoring, cost control, scheduling, and Earned Value Management (EVM) skills

Outlines 

Day 1: Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Day 2: Scope of the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Day 3: Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

 Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline: Managing Changes in Scope

Day 4: Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Day 5: Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (56)

CO8113

10 - 14 Jan 2027

Cairo (Egypt) -

Cost: 4100 € Euro


  About Cairo

Cairo is a mesmerizing assortment of iconic monuments, bustling markets, and ancient sites encircled by a vast and sprawling metropolis. At its core lies a maze-like medieval quarter. A world away from the modern side of the city, it boasts a seductive blend of intricate mosques, jostling crowds, madrasas, and traditional hammams. No visit could be complete without visiting the awe-inspiring Giza Pyramids that preside over the city's horizon. Whether you come to delve into the city's ancient past, dive into colorful souqs, sip mint tea and contemplate thousands of years of history or explore the city's cosmopolitan side, you'll be left with memories to last a lifetime.


  Things to do and places to visit in Cairo

The multi-layered capital of Egypt offers its visitors lively markets, authentic restaurants, and a multitude of ancient sights and archeological findings. Gaze in wonder at the Pyramids, take an awe-inspiring look at Tutankhamen's burial mask, shop for handmade souvenirs in the bazaars or hop on a sunset cruise down the Nile and embrace the sensory overload that is Cairo.

Take a vacation in Cairo and you can:

  • Visit the Great Sphinx of Giza, one of Ancient Egypt's great mysteries.
  • Explore the ramparts of the Salah El-Din Citadel.
  • Join locals drinking coffee at Fishawi Café, one of Cairo's first cafes and most important meeting spots.
  • Marvel at the seemingly endless historical artifacts on display at the Egyptian Museum.
  • Learn about the Ummayad, Ottoman, and Ayyubbid dynasties and more at the Museum of Islamic Art.
  • Haggle for souvenirs and gifts at the Khan el-Khalili souk.
  • See one of the world's oldest universities at the Al-Azhar Mosque, one of the city's original mosques.
  • Take a tour of the showstopping Giza pyramids.
  • Savor local cuisine such as mezze in the old city.
  • Wander through the labyrinth-like streets of Coptic Cairo, the city's ancient quarter, and spot Roman relics.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019