Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (56)

CO8113

11 - 15 Oct 2026

Istanbul (Turkey)

Hotel : DoubleTree by Hilton Istanbul Esentepe

Cost : 6300 € Euro

Introduction

Effective project management is essential in today’s competitive environment to ensure projects are completed on time, within budget, and according to technical requirements. This course focuses on Earned Value Management (EVM) as a powerful tool for measuring project performance, controlling costs and schedules, forecasting project outcomes, and supporting better decision-making throughout the project lifecycle.

Objectives

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

Target Audience

  • Project Managers and Project Engineers
  • Planning and Scheduling Engineers
  • Cost Control and Project Control Professionals
  • PMO and Program Management Professionals
  • Contracts and Technical Managers
  • Construction, Engineering, and Infrastructure Professionals
  • Operations and Maintenance Project Teams
  • Professionals involved in budgeting, forecasting, and performance measurement
  • Team Leaders responsible for project execution and reporting
  • Anyone seeking to improve project monitoring, cost control, scheduling, and Earned Value Management (EVM) skills

Outlines 

Day 1: Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Day 2: Scope of the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Day 3: Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

 Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline: Managing Changes in Scope

Day 4: Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Day 5: Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (56)

CO8113

11 - 15 Oct 2026

Istanbul (Turkey) - DoubleTree by Hilton Istanbul Esentepe

Hotel : DoubleTree by Hilton Istanbul Esentepe

Cost: 6300 € Euro


  About Istanbul

Few places compare to the vibrant, cosmopolitan city of Istanbul, whose enormous size straddles both Europe and Asia, forming a bridge between western and eastern cultures. Resting upon the natural harbor of the Golden Horn, the skyline of the once-Constantinople is pierced with minarets and ancient monuments that embody centuries of history. While it is brimming with historical landmarks and colorful markets, modern Istanbul is also well represented through its contemporary art scene, European-style café culture, world-class dining venues.


  Things to do and places to visit in Istanbul

Istanbul is teeming with attractions and landmarks from historic sights and unique cuisine to lively markets and unmistakable culture. It is a thriving city, with a myriad of things to do that skillfully manage to blend every aspect of both the contemporary and the historical world.

On a city break in Istanbul be sure to:

  • Visit a hammam, a traditional Turkish bath, whose origins date back to Roman times.
  • Marvel at the Hagia Sophia, Süleymaniye Mosque and Blue Mosque, Istanbul's most spectacular monuments that dominate the skyline.
  • Explore the Topkapi Palace Museum, one of Istanbul's most visited museums, home to over 80,000 artifacts.
  • Walk through the Basilica Cistern, an underground marvel built in the 4th century.
  • Be dazzled by the Grand Bazaar, one of the world's oldest and largest covered markets.
  • Go shopping for exotic products and Turkish delights in the Spice Bazaar.
  • Cross the bridge connecting Europe and Asia against the backdrop of the Bosphorus, or take a Bosphorus cruise.
  • Taste the diversity and flavor of Turkish cuisine.
  • Admire panoramas of the city from the Galata Tower.
  • Walk through Taksim Square, the city's dynamic square that never sleeps.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019