INTRODUCTION

The management of technical projects is becoming a challenge to professional engineers in an increasingly competitive marketplace in which effective project planning and control approaches in compliance with clients’ contractual requirements.  Successful project managers demand that their projects meet technical objectives and be completed on schedule and within budget. To ensure success, an effective project control system must be designed, developed and implemented to provide management with timely and accurate information on deviations of cost and time parameters from the target objectives established during the planning cycle of the project.

Earned Value Management (EVM) is a project planning and control approach which provides cost and schedule performance measurements. It compares actual accomplishment of scheduled work and associated cost against an integrated schedule and budget plan. Its benefits include visibility into the true progress of the project work against the budget, projections of anticipated project schedule and cost trends and the ability to take timely corrective actions for undesired variances. EVM is considered to be one of the most powerful and productive concepts utilized in managing today’s complex projects in private, commercial or government environments.

PROGRAMME OBJECTIVES

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

PROGRAMME SUMMARY

 

This training session is designed for those who want to learn the principles of EVM used for project performance measurement, a proven method to evaluate project work progress in order to identify early potential schedule slippage and areas of budget overruns.  It provides practical coverage of an accurate and realistic reflection of the integrated scope, cost and schedule parameters of a project to assist both contractors and client management in the decision-making process.

 

PROGRAMME OUTLINE

Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Scope the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline : Managing Changes in Scope

Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Project, Contract

Training Course: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (46)

PC4071

8 - 12 Dec 2025

Rome (Italy) -

Cost: 5750 € Euro


  About Rome

As cosmopolitan and diverse as it is rooted in its own history, Rome is one of the premier tourist destinations in the world. Featuring some of the best restaurants on the continent, some of the most iconic historic sites in Europe, the city is widely regarded as one of the most exciting and dynamic places to visit anywhere. The center of the Renaissance, the city houses some of the most famous works of art in the world and remains an important cultural hub to this day. Famous for art, fashion, it's delicious local cuisine, and superbly preserved monuments, Rome truly offers something for everyone.


  Things to do and places to visit in Rome

When disembarking, the first thing that can prove pleasantly challenging is deciding on what to do first! An exceptional array of hotels and inns are available to any weary traveler, as are a superb range of restaurants for those wanting to relax surrounded by the hustle and bustle of Rome in the evening. You can spend the day walking streets steeped in history, visiting galleries that contain works by Caravaggio and Michelangelo or exploring the awe-inspiring Colosseum. The city contains many beautifully maintained parks and gardens, as well as a vast collection of beautiful churches and cathedrals, ensuring that a trip to Rome will be a memorable experience for anyone.

Things to do when taking flights to Rome include:

  • Standing inside the magnificent Colosseum.
  • Gazing in awe at the stunning Castel Sant'Angelo.
  • Visiting the incredible Pantheon, one of the best-maintained buildings from the Roman era.
  • Stopping at the center of the Piazza del Popolo, one of the most beautiful squares in Europe.
  • Walking the beautiful gardens of Villa Borghese.
  • Admiring the vast, intricately carved Column of Marcus Aurelius.
  • Wandering the Forum Romanum, ruins from the Ancient Roman period.
  • Exploring some of the greatest art collections in Europe.
  • Crossing the river on the remarkably-constructed Bridge of Angels.
  • Sampling the world famous local cuisine.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 Australia Street, Raouche Beirut, Lebanon .، Beirut, Lebanon
 0096181746278
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019