Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (46)

CO8113

12 - 16 Oct 2025

Dubai (UAE)

Hotel : Residence Inn by Marriott Sheikh Zayed Road, Dubai

Cost : 4900 € Euro

Introduction

The management of technical projects is becoming a challenge to professional engineers in an increasingly competitive marketplace in which effective project planning and control approach in compliance with clients’ contractual requirements.  Successful project managers demand that their projects meet technical objectives and be completed on schedule and within budget. To ensure success, an effective project control system must be designed, developed, and implemented to provide management with timely and accurate information on deviations of cost and time parameters from the target objectives established during the planning cycle of the project.

Earned Value Management (EVM) is a project planning and control approach that provides cost and schedule performance measurements. It compares the actual accomplishment of scheduled work and associated cost against an integrated schedule and budget plan. Its benefits include visibility into the true progress of the project work against the budget, projections of anticipated project schedule and cost trends, and the ability to take timely corrective actions for undesired variances. EVM is considered to be one of the most powerful and productive concepts utilized in managing today’s complex projects in private, commercial, or government environments.

Conference Objectives of Earned Value Management

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

Conference Summary of Earned Value Management

This training session is designed for those who want to learn the principles of EVM used for project performance measurement, a proven method to evaluate project work progress in order to identify early potential schedule slippage and areas of budget overruns.  It provides practical coverage of an accurate and realistic reflection of the integrated scope, cost and schedule parameters of a project to assist both contractors and client management in the decision-making process.

Conference Outlines of Earned Value Management

Day 1: Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Day 2: Scope of the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Day 3: Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

 Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline: Managing Changes in Scope

Day 4: Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Day 5: Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Conferences

Conference: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (46)

CO8113

12 - 16 Oct 2025

Dubai (UAE) - Residence Inn by Marriott Sheikh Zayed Road, Dubai

Hotel : Residence Inn by Marriott Sheikh Zayed Road, Dubai

Cost: 4900 € Euro


  About Dubai

Dubai, located on the Persian Gulf, is one of the seven United Arab Emirates and one of the most popular tourist destinations in the world. The discovery of oil in the region has made Dubai extremely wealthy, allowing it to build the glittering skyscrapers that it is now famous for. That wealth is strongly in evidence in Dubai and visitors will see luxurious buildings and supercars aplenty. Perfect beaches and endless shopping opportunities are to key to Dubai's attractions. Flights to Dubai open up the city's cultural attractions to tourists, with beautiful mosques, museums and art galleries scattered throughout this ultra-modern metropolis.


  Things to do and places to visit in Dubai

Dubai's wealth has made it famous for building ever taller buildings and creating artificial islands off its shores. The city's hotels are luxurious and shoppers will love its extensive shopping malls which showcase all the world's top brands. Dubai's attractions don't end there. Dubai also caters to adventure lovers, who can jump in a 4x4 or on a board to speed over dunes outside the city. Local culture mustn't be forgotten either, and visitors have wonderful mosques to visit and old districts to explore. All that combined means that a flight to Dubai is sure to lead to an unforgettable holiday.

When visiting Dubai, be sure to:

  • Go to the observation deck of the Burj Khalifa, the tallest building in the world.
  • Admire the intricately beautiful Grand Mosque, which has the tallest minaret in the city.
  • Understand the local history and culture with a visit to the Dubai Museum.
  • Discover objects from the 6th century at Jumeirah Archaeological Site.
  • Go skiing – That's not a joke, the Mall of the Emirates houses a snowdome.
  • Go shopping at the Mall of the Emirates or the Dubai Mall.
  • Explore the desert surrounding the city – either by 4x4 or atop a camel.
  • Eat fantastic seafood at Dubai Marina.
  • Cool off at the Wild Wadi Waterpark.
  • Marvel at gorgeous Arabic calligraphy at Jumeirah Mosque, the biggest in the city.
  • Take a yacht tour around the artificial islands of Palm Jumeirah.
  • Haggle for souvenirs in one of the city's souks.
  • Wander around the traditional building in Bastakiya District.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 Australia Street, Raouche Beirut, Lebanon .، Beirut, Lebanon
 0096181746278
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019