INTRODUCTION

The management of technical projects is becoming a challenge to professional engineers in an increasingly competitive marketplace in which effective project planning and control approaches in compliance with clients’ contractual requirements.  Successful project managers demand that their projects meet technical objectives and be completed on schedule and within budget. To ensure success, an effective project control system must be designed, developed and implemented to provide management with timely and accurate information on deviations of cost and time parameters from the target objectives established during the planning cycle of the project.

Earned Value Management (EVM) is a project planning and control approach which provides cost and schedule performance measurements. It compares actual accomplishment of scheduled work and associated cost against an integrated schedule and budget plan. Its benefits include visibility into the true progress of the project work against the budget, projections of anticipated project schedule and cost trends and the ability to take timely corrective actions for undesired variances. EVM is considered to be one of the most powerful and productive concepts utilized in managing today’s complex projects in private, commercial or government environments.

PROGRAMME OBJECTIVES

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

PROGRAMME SUMMARY

 

This training session is designed for those who want to learn the principles of EVM used for project performance measurement, a proven method to evaluate project work progress in order to identify early potential schedule slippage and areas of budget overruns.  It provides practical coverage of an accurate and realistic reflection of the integrated scope, cost and schedule parameters of a project to assist both contractors and client management in the decision-making process.

 

PROGRAMME OUTLINE

Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Scope the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline : Managing Changes in Scope

Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Project, Contract

Training Course: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (46)

PC4071

26 - 30 May 2025

Paris (France) -

Cost: 5500 € Euro


  About Paris

Lying on the River Seine, Paris is commonly referred to as the city for lovers, but it's actually a fantastic place for anyone to visit and explore. It's full of history, art, literature and amazing architecture for starters, but is also well known as being home to high fashion, which makes it a popular shopping destination. Visitors to the French Capital will find both high-end designer stores and quirky boutiques. The attractions of Paris range for art museums to shopping to simply taking a walk and soaking up the atmosphere. To top it all off, Paris has plenty of superb food and drink, in case there weren't already enough reasons to travel to Paris.


  Things to do and places to visit in Paris

Anyone who travels to Paris is in for a treat, as it is a beautiful city full of atmosphere. Many of Paris' attractions are world-famous, but it's also a city where you can find hidden gems. Taking a flight to Paris for a short visit is really like visiting a number of different cities, as all of its neighbourhoods, or arrondissements, have their own distinct character. Examples include the medieval Latin Quarter and the bohemian Marais. Each and every one is worth exploring.

Great things to do in Paris include:

  • Checking out the views from the top of the Eiffel Tower.
  • Seeing renowned masterpieces, including the Mona Lisa in the Louvre.
  • Taking a tour of the impressive, albeit slightly creepy, Paris Catacombs.
  • Marvelling at the beautiful Notre Dame Cathedral.
  • Browsing the designer stores around the Champs-Elysees.
  • Munching snails in one of the city's haute cuisine eateries.
  • Visiting the graves of luminaries including Oscar Wilde and Jim Morrison at Pere Lachaise Cemetery.
  • Admiring the imposing Arc de Triomphe.
  • Wandering around the boutiques of the Marais district.
  • Watching the famous Paris St-Germain football team play.
  • Taking in the Impressionist art at the Musee D'Orsay.
  • Watching the world go by from a cafe terrace.
  • Visiting the distinctive Centre Georges Pompidou.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 Australia Street, Raouche Beirut, Lebanon .، Beirut, Lebanon
 0096181746278
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019