Project, Contract

Training Course: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (20)

PC4071

26 - 30 Aug 2024

Madrid (Spain)

Hotel : Pestana CR7 Gran Vía

Cost : 5250 € Euro

INTRODUCTION

The management of technical projects is becoming a challenge to professional engineers in an increasingly competitive marketplace in which effective project planning and control approaches in compliance with clients’ contractual requirements.  Successful project managers demand that their projects meet technical objectives and be completed on schedule and within budget. To ensure success, an effective project control system must be designed, developed and implemented to provide management with timely and accurate information on deviations of cost and time parameters from the target objectives established during the planning cycle of the project.

Earned Value Management (EVM) is a project planning and control approach which provides cost and schedule performance measurements. It compares actual accomplishment of scheduled work and associated cost against an integrated schedule and budget plan. Its benefits include visibility into the true progress of the project work against the budget, projections of anticipated project schedule and cost trends and the ability to take timely corrective actions for undesired variances. EVM is considered to be one of the most powerful and productive concepts utilized in managing today’s complex projects in private, commercial or government environments.

PROGRAMME OBJECTIVES

  • Obtain knowledge in understanding and using an effective performance management system in managing technical projects effectively
  • Manage projects using a proven, effective performance measurement technique
  • Work with clients to define project objectives and develop a project plan and put it into action
  • Make project decisions concerning scope, cost and schedule parameters faster, more effectively and more confidently
  • Stay on top of schedules, budgets, workloads and human resources issues and delegate practically and fairly
  • Learn to avoid the pitfalls of project management by quickly identifying potential project risks and mitigate them as early as possible

PROGRAMME SUMMARY

 

This training session is designed for those who want to learn the principles of EVM used for project performance measurement, a proven method to evaluate project work progress in order to identify early potential schedule slippage and areas of budget overruns.  It provides practical coverage of an accurate and realistic reflection of the integrated scope, cost and schedule parameters of a project to assist both contractors and client management in the decision-making process.

 

PROGRAMME OUTLINE

Introduction to Earned Value Management (EVM)

  • Management Criteria versus Engineering Criteria
  • Evolution of the Earned Value Management (EVM) Concept
  • The Cost/Schedule Control System Criteria (C/SCSC)
  • The EVM System Criteria
  • Performance Measurement- An Effective EVM Technique
  • EVM in Project Management

Scope the Project

  • Understanding the Project Work Scope
  • Work Breakdown Structure (WBS)
  • Make-or-Buy Choice
  • WBS and Earned Value

Plan and Schedule the Project

  • Understanding the Project Objective
  • Planning the Project
  • Scheduling the Project
  • Scheduling and Earned Value

Estimate and Budget Project Resources to Form Control Account Plans (CAPs)

  • Integrating the Project Work Scope with Cost and Schedule
  • Earned Value CAPs
  • Cost Estimates and Budgets
  • Management Reserves

Establish the Earned Value Project Baseline

  • Methods Used to Plan and Measure Earned Value
  • Control Account Plans (CAPs)
  • The Performance Measurement Baseline (PMB)
  • Maintaining the Baseline : Managing Changes in Scope

Monitoring Performance Against the Baseline

  • CAPs Performance Measurement
  • Presentations to Project Management
  • Earned Value Cost and Schedule Variances
  • Materials and Subcontracts in EVM

Final Cost and Schedule Forecasting

  • Determining Factors
  • Cost and Schedule Results Methodology
  • Management Reserve or Contingency Reserve
  • Estimate At Completion (EAC)
  • The Over Target Baseline (OTB) Process
  • Predicting the Project’s Time Duration

EVM Reporting

  • Subcontractors’ Reporting
  • Preparing and Interpreting the Integrated Cost/Schedule Report
  • The EVM Reporting Formats

Project, Contract

Training Course: Earned Value Management for Project Performance Measurement


Register Now
Quick Inquiry
Discount Group Download Brochure (20)

PC4071

26 - 30 Aug 2024

Madrid (Spain) - Pestana CR7 Gran Vía

Hotel : Pestana CR7 Gran Vía

Cost: 5250 € Euro


  About Madrid

Madrid is a city that combines its enduring history with its cosmopolitan atmosphere to create a destination that favored amongst tourists from around the world. This is a city that is very much bursting at the seams with life and its vibrant atmosphere, cultural attractions and connection with history ensure travelers have everything they could possibly want from a European city break. At the end of a flight to Madrid, there are sites to see, picturesque streets to roam and, of course, excellent shopping opportunities to explore. Visitors can immerse themselves in Madrid's fantastic local culture, its peerless art scene and world acclaimed fine dining. In fact, there is very little that Madrid doesn't have to offer.


  Things to do and places to visit in Madrid

The only problem travelers will encounter during their visit to Madrid is knowing what to do first. Sampling the mouth-watering tapas, strolling through one of the many excellent museums or even simply soaking up the atmosphere are all excellent options. Spend a sunny day wandering through the splendid squares or marvel at the intricate architecture of the churches.With so many options, flights to Madrid are great for people of any age or inclination.

When visiting Madrid, be sure to:

  • See the superb collection of art is the Museo del Prado.
  • Stroll down the Gran Via.
  • Enjoy the atmosphere of the Plaza Mayor.
  • Wander through the stunning gardens of the Parque del Buen Retiro.
  • See the beautiful mansion of the Museo Lazaro Galdiano.
  • Find quirky fashions in the Fuencarral market.
  • Try some of the many different tapas dishes.
  • Visit the statues of Don Quixote and Sancho Panza in the Plaza de Espana.
  • See the breathtaking Basilica de San Francisco El Grande.
  • Wander the Casa de Campo park, which is five times the size of Central Park.
  • Shop in the luxury boutiques of the Golden Mile.
  • Look for bargains at the El Rasto flea market.
  • See Picasso's Guernica in the Reina Sofia museum.
  • Snack on churros with chocolate.
 22 Portman Square, Marylebone, London W1H 7BG, UK
 3 Oudai street, Aldouki, Giza, Giza Governorate, Egypt
 0020233379764
 00201095004484
 00201102960555
 00201102960666
 19 Mayıs Mahallesi, 19 Mayis Street No 2 Sisli, 34360 Istanbul/Turkey
 00905357839460
 Australia Street, Raouche Beirut, Lebanon .، Beirut, Lebanon
 0096181746278
 811 Massachusetts Avenue, Boston, Massachusetts, 02118, USA
 6 Beirut Street - Fifth Circle Abdoun, P.O. Box 831370, 11183 Amman, Jordan
Copyright Global Horizon Training Center © 2019